Accelerator and the Others
- Operation Status of HIRFL in 2012
- Manufacturing and Design of Thin Wall Dipole Chambers at HIMM
- Development of Prototype of BUMP Ceramic Chamber for HIMM
- Test Cryomodule Design
- Vertical Test Dewar Design
- Cryomodule Ⅱ POST Design
- Helium Recovery and Purification System
- Thermoanalysis of Thermal Shield in Test Cryomodule Project
- LLRF Control System
- RFQ Design of ADS Project at IMP
- IMP Superconducting HWR Design, Fabrication and Cold Test
- Vertical Test System Development and Cavity Test Result
- Development and Research of Machine Protection System with PLC Redundancy Based on EPICS
- Automated Facility for SRF Cavity BCP Process
- Progress of Barrel Polishing of HWR Superconducting Cavity