2014 Annual Report
Accelerator and the Others
- Operation Status of HIRFL in 2014
- Recent Progress of the SSC-Linac
- Closed Orbit Correction in Electron Cooler Section at CSRe
- Longitudinal Electron Cooling Experiments at HIRFL-CSRe
- Progress of Superconducting Linac for China ADS
- Design of RF System for C-ADS Injector II RFQ
- Mechanical Design and Fabrication of 162.5 MHz Buncher for C-ADS Injector II
- LLRF Control System for ADS Injector II
- CW Beam Test of the Injector II RFQ for ADS Project
- Successful High Power Test of HSC Type Injector for Cancer Therapy in IMP
- Mechanical Design of the Bead-Pull and Tuning Test Device for the CH Cavity at IMP
- Study of IMP Superconducting CH Cavity
- ChannelFinder and Elasticsearch Benchmark
- Beam Commissioning of Superconducting Demo Facility
- Development of the User Interface for C-ADS Accelerator System Using CS-Studio